A few weeks ago, we announced the future range of PU-R steel sheet pile sections that are intended to replace the low-end range PU sections. The new PU 7R and PU 10R will be rolled beginning of 2008. PU 14R will be introduced after those two sections: availability mid 2008.
The last rollings of PU 6 and PU 8 are already fully booked, and consequently, we suggest the use of GU sections, cold-formed sections or PU-R sections (for long term projects). We encourage our customers to consider these changes for all new projects. Our technical department can assist our customers to work out alternative solutions to PU 6 and PU 8 sections.
The PU 12 section will still be rolled during the first months of 2008. Please note that the PU 12-10/10, with a minimum thickness of 10 mm over the whole pile, will be available until further notice.
Section properties and technical delivery conditions of the new PU-R sheet piles can be found in our specific brochure available on this website for download or as a hard copy: ‘PU-R Section’.
This announcement is for general information purposes only. It is provided without warranty of any kind. ArcelorMittal Commercial RPS S.à r.l. shall not be held responsible for any errors, omissions or misuse of any information and hereby disclaims any and all liability resulting from the ability or inability to use above information.
Anyone making use of this material does so at his/her own risk. In no event will ArcelorMittal Commercial RPS S.à r.l. be held liable for any damages including lost profits, lost savings or other incidental or consequential damages arising from use of or inability to use the information above.
Our sheet pile range is liable to change without notice.